Client / Work Location | Hong Kong Electric (Lamma Power Station) |
Date: | Nov, 2021 |
|
Medium | Steam |
Operating Pressure | 1.7 bar to 160 bar |
|
Problem | Unit 11 new boiler safety valves to be tested to fulfill the boiler vessel regulation |
Solution | Furmanite carried out Trevitest on site |