Client / Work Location | HSBC Center Tower |
Date: | Jan, 2022 |
Size | 200mm (8") |
Medium | Chilled Water |
Operating Pressure | 3 bar |
Operating Temperature | 7°C |
Problem | Adding valves to existing pipeworks |
Solution | Perform pipe freezing to isolate the water, avoid draining off water from the whole system and kept the other parts of system running. |