ServicePipe Freezing
Client / Work LocationHSBC Center Tower
Date:Dec, 2021
Size80mm, 100mm (3", 4")
MediumChilled Water
Operating Pressure3 bar
Operating Temperature7°C
ProblemAdding valves to existing pipeworks
SolutionPerform pipe freezing to isolate the water, avoid draining off water from the whole system and kept the other parts of system running.
epal-logo