ServiceSpeciality Coating
ClientA 5-star Hotel in Tsim Sha Tsui
Date:Sep, 2020
MediumSea Water
Design Pressure16 Bar
Design Temperature30°C
ProblemChiller waterbox was found leakage with an 8mm pinhole.
SolutionFurmanite designed a repair solution and completed the repair at site with Belzona 1212 surface-tolerant epoxy composite in a short period of time.

For more product details: https://www.belzona.com/en/products/1000/1212.aspx
epal-logo