Service | Composite Repair |
---|---|
Client / Work Location: | Exxon Mobil |
Date: | Jun, 2020 |
Medium | Diesel |
Design Pressure | 10 Bar |
Design Temperature | 25°C |
Problem | Erosion and pitting found at the bottom of the pipe |
Solution | Design a composite repair by using Pipe Wrap to provide a repair lifetime for 10 years |
Unit 1508, Billion Plaza,
8 Cheung Yue Street,
Cheung Sha Wan,
Kowloon, Hong Kong